Impact
1 hold
Waiting on material
The line was scheduled to start. It stood until the material arrived.
Evidence
Scheduled start against the actual start.
Next
Name the material that held the line.
FieldproofsIndustriesManufacturing
Manufacturing
The schedule, the spec, and the order each tell a different story. Fieldproofs reads them against what the line actually did.
It reads the schedule, the spec, and the change order.
Line 3 · one run
Sample dataWhat it surfaces
Each one names what happened, the record that proves it, and the next action.
Impact
1 hold
The line was scheduled to start. It stood until the material arrived.
Evidence
Scheduled start against the actual start.
Next
Name the material that held the line.
Impact
$3,100
The run used the spec the change order had already replaced.
Evidence
The spec on the order and the spec that ran.
Next
Stop the old spec.
Impact
1 pull-in
The line was pulled forward. The order still shows the standard price.
Evidence
The change order and the price on the order.
Next
Price the expedite.
Impact
1 setup
The changeover took longer than the time on the schedule.
Evidence
Scheduled changeover against the actual setup.
Next
See the changeover that runs long.
We will show you the holds, the scrap, the unpriced expedites, and the changeovers that ran long.