FieldproofsIndustriesManufacturing

Manufacturing

See what the line lost on the run.

The schedule, the spec, and the order each tell a different story. Fieldproofs reads them against what the line actually did.

See how it works

It reads the schedule, the spec, and the change order.

Line 3 · one run

Sample data
  • Waiting on material1 holdOpen
  • Scrap from the old spec$3,100Open
  • Expedite off the order1 pull-inOpen
  • Changeover ran long1 setupOpen
  • Standard runOn planCleared

What it surfaces

Four inefficiencies on the same record.

Each one names what happened, the record that proves it, and the next action.

Impact

1 hold

Waiting on material

The line was scheduled to start. It stood until the material arrived.

Evidence

Scheduled start against the actual start.

Next

Name the material that held the line.

Impact

$3,100

Scrap

The run used the spec the change order had already replaced.

Evidence

The spec on the order and the spec that ran.

Next

Stop the old spec.

Impact

1 pull-in

Expedite

The line was pulled forward. The order still shows the standard price.

Evidence

The change order and the price on the order.

Next

Price the expedite.

Impact

1 setup

Changeover

The changeover took longer than the time on the schedule.

Evidence

Scheduled changeover against the actual setup.

Next

See the changeover that runs long.

Bring a week of closed runs.

We will show you the holds, the scrap, the unpriced expedites, and the changeovers that ran long.